CO2 RECOVERY PLANT 3.5T/HOUR ABOU-QIR ALEXANDRIA

Project owner:
Air Liquide Egypt.

Project Main contractor:
MICON.

Micon scope of works:

  •  Site investigation – bore holes at factory and administration building locations (6 bore holes).
  •  Design of foundations and super structure (steel for plant and R.C for administration building).
  •  Main drawing and shop drawing for both building.
  •  Construction of CFA piles diam. 50 cm, depth 27.0 m with 17.0 m length RFT.
  •  Construction of pile caps.
  •  Supply, fabricate, paint and erect of steel structure for plant.
  •  Construction of administration building R.C.
  •  Supply and install metal corrugated for roof and sides of the plant 0.7mm thick.
  •  Supply and install overhead crane single girder 5.0 ton capacity span 15.0 m and run way 16.0 m.
  • Electro mechanical work for the plant :-
    • Installation of all equipment.
    • Supply and install pipes and pipes rack.
    • Supply and install cables for electrical feeding, instrument and lighting.