Micon scope of works:

  • Site investigation – bore holes at tanks locations (8 bore holes).
  • Design of foundations and super structure (R.C).
  • Main drawing and shop drawing for pipe racks and filling station.
  • Construction of CFA piles diam. 60 cm, depth 24.0 m with 12.0 m length RFT.
  • Construction of pile caps.
  • Supply, fabricate, paint and erect of steel structure for pipe racks and filling station.
  • Supply and install metal corrugated for roof of filling station.
  • mechanical work for the tanks :-
    • Site investigation – bore holes at tanks locations (8 bore holes).
    • Design of foundations and super structure (R.C).