Project owner:
Gulf of Suez petroleum company – GUPCO.

Project Main contractor:
MICON.

Micon scope of works:

  • Design of steel frames to cover area with 15×60 m with electrical over head single crane 5.0 ton capacity with span 13.60 m.
  • Main drawing for steel structure.
  • Shop drawing for steel structure.
  • Supply fabricates, paint and erect steel structure.
  • Supply and install of 0.5 mm colored corrugated sheet for roof sides.
  • Supply and install of 0.5 mm colored corrugated sheet for roof sides.
  • Supply and install electric single girder 5.0 ton over head crane span 13.6 m run way 60 m.
  • Supply and install the lighting system.